Smoothly Deliver the Key to the Project and Break the Record of the Beverage Water Industry: On July 18, 2016, the trial production was conducted and the project results were checked with the customer. All processes including design, manufacturing, installation, commissioning and production were smoothly carried out, and the turnkey project was thus completed. The period of construction was shortened by 2 months and 10 days, setting a new record in the drinking water industry.